They have a 6 to 7 week lead time.
Standard construction details and options: 5/8” furniture board box construction and maple melamine drawers dowelled and glued at joints with 3/4-extension glides. Drawers can be upgraded to maple dovetail or metal and/or to full-extension soft close glides. The box construction can be upgraded to plywood (with some restrictions.) For more details, please visit their website.
![]()